Cumberland Ridge Subdivision
28-lot subdivision development including roadway, water, sewer, and lot grading on a challenging hillside site. Site work included over 80,000 cubic yards of earthwork, 3,800 linear feet of water main, 4,200 linear feet of sanitary sewer, and a stormwater detention basin sized for the full build-out.
We coordinated with the engineer, county, and utility districts to deliver the infrastructure on schedule, allowing the developer to begin home construction on lot 1 within four months of mobilization.